Licogi 16.8 - applications Technology Topbase in Phuoc Khanh Petroleum Depot works Nhon Trach, Dong Nai save over 40% of the cost of the foundation

Licogi 16.8 - applications Technology Topbase in Phuoc Khanh Petroleum Depot works Nhon Trach, Dong Nai save over 40% of the cost of the foundation

Petroleum tank works - total inventory Petroleum Phuoc Khanh, Phuoc Khanh - Nhon Trach - DONGNAICost...

The application of new technology – topbase foundation – bubbledeck –light concrete brick to constructions

The application of new technology – topbase foundation – bubbledeck –light concrete brick to constructions

Licogi 16.8 investment consultants joint stock company is in the pioneer in adopting new technology to...

Circular 09/2012/TT-BXD dated 28/11/2012 of the Ministry of Construction

Circular 09/2012/TT-BXD dated 28/11/2012 of the Ministry of Construction

Circular 09/2012/TT-BXD dated 28/11/2012 of the Ministry of Construction to use non-baked building materials...

LICOGI 16.8 (JSC) ANNUAL SHAREHOLDERS’ MEETING 2012 WAS HELD SUCCESSFULLY.

LICOGI 16.8 (JSC) ANNUAL SHAREHOLDERS’ MEETING 2012 WAS HELD SUCCESSFULLY.

On 18/04/2012, in the cultural hall rooms Corporation LICOGI 16, LICOGI 16.8 investment cosultants JSC...

LICOGI 16.8 (JSC) ANNUAL SHAREHOLDERS’ MEETING 2011 WAS HELD SUCCESSFULLY.

LICOGI 16.8 (JSC) ANNUAL SHAREHOLDERS’ MEETING 2011 WAS HELD SUCCESSFULLY.

On 26/03/2011 morning, at the Licogi 16.8 meeting-hall, Licogi 16.8 was held the annual shareholders’...

Outstanding works

>< >

WEB LINKS

mythumbnail

( The technology transfered to LICOGI 16.8 investment consultants joint stock and TADITS exclusive development in VietNam)
LICOGI 16.8 investment consultants joint stock company is in the pioneer in adopting new technology to the southern provinces construction market.  

 
 
 

TOP-BASE FOUNDATION - NEW TECHNOLOGY FOR THE OPTIMAL FOUNDATION SOLUTION ON SOFT GROUND.
 


In the previous article we introduced a new technology, the BubbleDeckdeck is beginning to develop in the Vieynam construction market. In this article we introduce a new technology to the buildingfoundation on soft ground. It's Top-Base Foundation solution.
In the last article, we has introduced new technology, BUBBLDECK deck part which is current developing in Vietnam construction market. In this article, that is Top-base foundation solution.
So what is the top-base foundation? How does it look like?
Do you see the fact as follows: In the work of leveling, there is a need to work that organic ground peeled before pouring sand into the leveled ground. Assuming that the removal soil is very weak (As farmland, for example), when put into training and construction machine peeled you will take any kind of machine? If you put your wheel to make sure that a machine will be sunk, wet lands can not be done. But if you put your caterpillar with the same weight as your wheel, you can be applied easily,caterpillar machine did still not sunk and run on soft ground.
So you can understand a simple way of our Top-base foundation, when it suffers the building load, it also works like a cater pillar. In particularly, how itisit what its advantages Vietnam like? It came from the Vietnamese market and it has been used in any work? Here we will introduce you.

 

Top-Base is a solution to handle soft ground, increasing the capacity to receive the load of the ground, reducing settlement and the time of the consolidation of land.
Top-Base technical foundation has been used in Japan and Korea for thousands of buildings, many condominiums from 17 to 20 floors, even as high as 30 floors were built on the Top-Base foundation without the pile.
Upon the occurrence of earthquakes, the buildings on the Top-Base base less damaged, while other building besides more damaged (quoting survey reports of damage earthquake in 1995 in Kobe-of Japan.)
Top-Base settlement consolidation process ends quickly (about 100 days after material full load) so when construction is complete the body home, Top-Base foundation was finished sinking, did not affect the extraction use of works.
Top-Base foundation has been deployed in Vietnam from 2008. At present there are over 10 projects in Hanoi, Haiphong, Hung Yen, Vinh Phuc, Thanh Hoa, Quang Ninh, Ho. HoChi Minh ... the application of this technology achieved good results.
The most effective solution for multi-story building on soft ground in Vietnam is to coordinate Top-Base foundation is reinforced with several piles to saved piles and decreased construction time, improved economic efficiency .

 

 

 

 

Top-Base technical foundation has been used in Japan and Korea for thousands of buildings, many condominiums from 17 to 20 floors, even as high as 30 floors were built on the Top-Base foundation without the pile.
Upon the occurrence of earthquakes, the buildings on the Top-Base base less damaged, while other building besides more damaged (quoting survey reports of damage earthquake in 1995 in Kobe-of Japan.)
Top-Base settlement consolidation process ends quickly (about 100 days after material full load) so when construction is complete the body home, Top-Base foundation was finished sinking, did not affect the extraction use of works.
Top-Base foundation has been deployed in Vietnam from 2008. At present there are over 10 projects in Hanoi, Haiphong, Hung Yen, Vinh Phuc, Thanh Hoa, Quang Ninh, Ho. HoChi Minh ... the application of this technology achieved good results.
The most effective solution for multi-story building on soft ground in Vietnam is to coordinate Top-Base foundation is reinforced with several piles to saved piles and decreased construction time, improved economic efficiency .
Top - Base method which put the funnel-shaped concrete block into ballast on soft soil layers. funnel-shaped concrete blocks were poured in place, consolidation settlement decreased from 1 / 10 - 1 / 2 or more, and increase the load capacity of base between 50% -200% or more compared with initially untreated ground.
 

 
2.  OCEAN VIEW  Apartment  at BRVT
  

Top - Base method effects to prevent horizontal displacement of soft soil layers and reduces the of expansion to reduce settlement foundations of the building, and distributes tress beneath the foundation bed are more likely to increase load capacity of base.
The specific project applied Top – base foundation in Vietnam:
1. Hotel, 32 Lo Su - Hanoi Old Quarter with 12-storey
3. International School of Thang Long - Bac Linh Dam, Hanoi, with 6 storeys
4. Hotel, Phu Dong, Thanh Hoa, 11 floors high
5.Hon Dau Island tourist resort (Do Son – Haiphong)
6. CONSTREXIM Corporation headquarters with 16 storeys
7. Auto Salon Minh Chanh with area 1400m2
8. Office for Rent - PG Urban, Haiphong 5-storey high
9. Bookstore-South Institute's Office of Science and Military Technology with 14 floors in 60Truong Son, Tan Binh District, Ho Chi Minh City.
10. Apartment - Office of the Nam An with 21-storey high, with a basement, in Binh Tan District, Ho Chi Minh City.

 THE PRIORITY OF TOP- BASE FOUNDATION METHOD.
1 - Advantages of cost: the application of top – base foundation can shorten construction time of foundation only half time and the foundations costs only 60% - 70%compared to the foundation part such as foundation, raft foundation, foundation tape...
Specifically, we propose an foundation estimation of LICOGI TECHNOLOGY TRAINING COLLEGE be built in Thanh Hoa, we directly calculate both the traditional pile foundation and Top – base foundation. Investors have the option to decide Top –Base foundation plan to reduce costs. Currently, construction is under the foundation. Through that you refer:
PROJECT:
LICOGI TECHNOLOGY TRAINING COLLEGE PHASE 1
TITTLE LIST: FOUNDATION STRUCTURE

NO

TITTLE NAME

PILE FOUNDATION

TOP-BASE FOUNDATION

DIFFERENCE

 
 

1

practise block

3.816.591.535

2.149.968.944

1.666.622.591

 

2

class block-administration

2.464.250.856

1.617.178.134

   847.072.722

 

3

practise construction block, garage block

644.505.665

474.282.891

170.222.775

 

4

corridor block

105.442.976

     47.914.207

    57.528.769

 

 

TOTAL

7.030.791.032

4.289.344.175

2.741.446.856

 
2 - The advantages of quality:
+ Ensure the safety of the load placed on soft ground
+ Reduce the overall settlement and subsidence of the building, while increase load capacity of the original base.
+ Completely eliminate adverse impacts due to noise and vibration
+ Ability to construction in place even in the narrow construction works
+ Construction of convenience do not need special equipment
+ Construction progress to be rapid thereby reducing construction costs
+ Friendly environment

SCOPE OF APPLICATION OF TOP-BASE FOUNDATION METHODS
Top-base method is widely used for background processing for civil and industrial works in transportation and communications as:
+ The work related to environmental protection : waste dump reclamation, waste place.
+ The low-rise and high-rise residential houses.
+ The industrial houses.
+ Tanks, storage tanks, the waste treatment works
+ The transportation and communications such as road and associated works,underground cable systems ...
With the superiority in cost, durability and wide range of applications of Top-base method. Top-base foundation will become increasingly widespread in the Vietnam construciton market . Especially in the soft ground.
Licogi 16.8 company respectfully welcome investors to new technology: TOP-BASE Foundation for building on soft ground.